Dual Supply Balance & Optimisation
The brief

Implementation
Aqualogic were commissioned to install controllers on a large dual supply system within the Whipton area of Exeter supplying a total of 3583 properties.
Over a period of six weeks, Aqualogic undertook the balancing and optimisation of this system. The outlet pressures of both PRV’s were decreased in 5mhd increments to mitigate any potential customer contacts until a total of a 19mhd reduction was made.
Following an initial review of the available data and consultation with local operations a staged approach was agreed and implemented.
Stage 1 – Desktop Study. This was undertaken to assess PRV elevations and CP locations to ensure balancing of the system could be completed and levels of service were maintained.
Stage 2 – Controller Installations. The two controllers were installed and commissioned in a synchronised fashion to ensure the PRV’s would not be fighting against each other for control.
Stage 3 – Following analysis of the logged data from the controllers and CP loggers the system was optimised. A time profile was implemented to further reduce night time pressures. Daily checks were undertaken to ensure operability and balancing of the system.
This case study served as an excellent demonstration of the benefits of profile optimisation. The changes made contributed to a 40,201 Property Meter Head reduction in pressure resulting in:
- An immediate reduction in the nightline (6.9m3hr) and the daily demand (229m3d)
- A long term benefit due to an 14% decrease in bursts
Results
“ … the changes made contributed to a 40,201 Property Meter Head reduction in pressure.”